Wednesday, January 10, 2007
Tuesday, January 09, 2007

The arch was put in mortared up and there was a door. The kiln was really coming together quickly and we knew it was only going to be a matter of time until we needed wood to fire. The fuel source was the next hurdle.




The last arch to go up was the doorway. The gentleman that built the main arch form was employed once more and did a great job with the door form. He was great. He reused every board, straightened every nail and reused them together. It was great craftsmanship and resourcefulness.

Once the bricks were laid and some final adjustments were made the arch form was pulled out and it looked like you had a kiln. The hard part was over, now it was just time for the finishing touches and I think Brian started to relax a bit.


The capstones were large and sturdy which offered tremendous stability for the arch. The arch brick themselves were special ordered and placed long ways so there were 9 inches of insulation to work with. It really became a well-insulated and large arch.


Next it was the arch. The arch form was made after figuring out the span. This took a little time to figure out because getting the right brick configuration is key for an arch system. Bob Anderson is a fan of the sprung arch and that is what he really wanted on this kiln. Finding the brick took some time, but was worth it in the long run.


The steel in the this kiln was tank worthy and will do it’s job of holding the kiln together for years to come. The buck stays were bolted at the top and welded and bolted to the concrete. It was a really top-notch job.



It is time for the wielding and these gentlemen go a great job. They work along with the mason and Brian like professional wrestlers tagging one another to go into the ring to do their work. The other will just sit out of the way resting and appreciating the others handy work.

The transition between the stack and the chimney was the area designated for the damper that would be a compressed kaowool type product that you can get in Jingdezhen for cheap. It is the size of a normal kiln shelf and works well. There are two so we could adjust the damper on both sides. The weilding would come next to make the kiln stronger.
Saturday, January 06, 2007

There was a lot of activity going on from the Bob Anderson and the West Virginia University people in the new studio space and it was creating some attention from the community. People would constantly come into the space to look at the work and see the Americans. At times there were television crews and Bob would t reluctantly take care of the PR.




It was time for the chimney to be constructed along with the building of the kiln. The pad for the foundation of the chimney was widened to displace the surface area of the base. The pad that the kiln was built on was relatively thin so we had to make some adjustments as they surfaced.


The bag wall is a major component in the design of this kiln and can be seen here intergrated into the wall and rising with the kiln. The main door to the fire box can be seen as well.

The bag wall is begining to take shape and you can see that it is solid as well as tied into the outside wall.

All the joints were mortared to create stronger kiln and increase the tightness of the kiln.
Here is an area where the chimney will be attached. These areas of attachment were all toothed to make the design stronger.




The exit flew and the wall structure can be seen here. The kiln walls were two bricks wide and it was constructed out of hard brick.